General Description
Outfitted with the zero leak bidirectional checking sole-noid valves, this electrical power unit is intended for your operation of two independent circuits. Which are respectively for the major and subordinate platforms in the double scissors lift. Two cut-off valves are utilized for reducing the machine manually in situation of energy loss. If more independent circuits are required for the application please speak to us for availability.
Remark: 1. Please seek advice from our income engineer to the different pump displacement, motor energy or tank capability.
2. CSA or UL certified motors are available on request.
Particular Notes
one. The AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean the many hydraulic components concerned just before installation of the electrical power unit.
three. Viscosity of the oil shoud be 15~46 cst,along with the oil should be clean and absolutely free of impurities,N46 hydraulic oil is recommended.
four. The electrical power unit should be mounted vertically.
5. Check the oil level from the tank soon after the first operating with the energy unit.
6. Oil altering is needed right after the initial one hundred operation hrs,afterwards after each and every 3000 hrs.